null
Need Help? 888-965-6577 x510

Rubi Tools

Rubi Slab Cutter G3 System

No reviews yet Write a Review
SKU:
70.01167
MPN:
16900
$880.65
  • Fast, Reliable Shipping
  • Expert Product Support
  • 30+ Years of Experience.
Rubi Slab Cutter G3 System

Description

Overview

The RUBI SLAB CUTTER G3 16900 is a guide-based manual cutting system for large-format porcelain sheets. Red aluminum rails join with quick couplings, and the scoring carriage runs on three horizontal bearings before the separate SLAB nipper breaks the scored material.

Features

  • Lightweight G3 guides with a design that retains the carriage on the track.
  • Quick-coupling guide connections.
  • Integrated suction cups with non-marking rubber bases for light-colored material.
  • 22 mm EXTREME scoring wheel for smooth, rough and structured finishes.
  • Soft-grip carriage handle and dual-function SLAB nipper.

What's Included

  • Three red aluminum G3 guides with suction attachments.
  • Aluminum scoring carriage with 22 mm EXTREME wheel.
  • Dual-function SLAB nipper.
  • Padded reinforced textile transport bag with compartments.

Specifications

  • Reference: 16900
  • Supplied-guide cutting capacity: Up to 126 in. (approximately 3.2 m)
  • Scoring wheel: 7/8 in. (22 mm) EXTREME
  • Included nipper capacity: Up to 10 mm (0.39 in.) material thickness
  • Guide count: Three; additional compatible sections can extend the system

Applications

Use for manual scoring and separation of large-format porcelain sheets. The supplied rails establish the cutting path, while the nipper’s 10 mm limit governs the included breaking tool.

Selection and Use

  • Connect and secure the G3 guides for the required cut before scoring.
  • Check the slab thickness against the supplied nipper’s capacity.
  • Additional guide sections extend length, not the nipper’s material-thickness capacity.
  • Keep the suction bases clean and confirm their attachment to the actual surface.

Extra Information

Brand:
Rubi Tools
70.01167:
16900
Dropship Field:
ADDITIONAL 1-2 DAYS FOR ORDER PROCESSING